|
|
|
| 26.10.2005 | | The cold startup as well as the leak test have been performed successfully. |  (see full-size image) | At the disposal in Friedland near Göttingen the installation of the aggregate for the wet processing by Maschinenbau Lohse as well as the electric connection are completed.
| | back |
|
|
|