|
|
|
| 16.09.2005 | | Installation in Friedland is completed. |  (see full-size image) | At the disposal in Friedland near Göttingen the installation of the aggregate for the wet processing by Maschinenbau Lohse as well as the electric connection are completed.
The start-up is supposed to be even in September. | | back |
|
|
|